ITAC Assessment: OK0166
ITAC logo
ITAC Assessment: OK0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product FLUID DAIRY PRODUCTS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 18,720
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $258,083 4,660,024
kWh
Natural Gas $72,278 19,628
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,327

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4154: Eliminate leaks in water lines and valves $3,054 $850 - $2,307
-
MMBtu
$747
02 2.8114: Change rate schedules or other changes in utility service $34,175 $6,260 $34,175
-
kWh
- -
03 2.2511: Insulate bare equipment $5,377 $2,398 $4,866
89,977
kWh
$511
-
MMBtu
-
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,074 $403 - $1,074
-
MMBtu
-
05 2.2414: Use waste heat from hot flue gases to preheat $7,782 $30,000 - $7,782
-
MMBtu
-
06 2.2511: Insulate bare equipment $950 $624 $950
17,585
kWh
- -
TOTAL RECOMMENDED $52,412 $40,535 $39,991
107,562
kWh
$11,674
-
MMBtu
$747
TOTAL IMPLEMENTED $6,327 $3,022 $5,816
107,562
kWh
$511
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs