ITAC Assessment: OK0155
ITAC logo
ITAC Assessment: OK0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product BELTS,BILLFOLDS,JEWELRY
NAICS
n/a
SIC 2387: Apparel belts
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 1,680,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,884 868,699
kWh
Natural Gas $13,224 3,099
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,407 $1,559 $4,407
64,771
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $4,853 $522 $4,486
65,944
kWh
- $367
03 2.6121: Reduce hot water temperature to the minimum required $338 - $338
8,792
kWh
- -
04 2.1123: Install automatic stack damper $415 $720 - $415
-
MMBtu
-
TOTAL RECOMMENDED $10,013 $2,801 $9,231
139,507
kWh
$415
-
MMBtu
$367
TOTAL IMPLEMENTED $10,013 $2,801 $9,231
139,507
kWh
$415
-
MMBtu
$367