| Assessment Year | 1984 |
|---|---|
| Principal Product | ELECTRICAL CONNECTORS |
| NAICS |
n/a
|
| SIC | 3678: Electronic Connectors |
| Sales Range | $10 M to 50M |
| # of Employees | 135 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $154,192 | 3,461,020 |
kWh
|
$0.045 |
| Natural Gas | $45,930 | 12,667 |
MMBtu
|
$3.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,740 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $25,566 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,160 | $900 |
$4,160
110,199
kWh
|
- | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $509 | $131 |
$509
13,482
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,650 | $6,252 | - |
$2,650
-
MMBtu
|
|
| 04 | 2.2447: Heat water with exhaust heat | $7,174 | $6,955 |
$2,640
51,290
kWh
|
$4,534
-
MMBtu
|
|
| 05 | 2.3191: Use demand controller or load shedder | $6,120 | $1,236 |
$6,120
-
kWh
|
- | |
| 06 | 2.2122: Install / repair insulation on condensate lines | $566 | $333 | - |
$566
-
MMBtu
|
|
| 07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $2,671 | $1,647 | - |
$2,671
-
MMBtu
|
|
| 08 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $2,036 | $720 |
$2,036
53,927
kWh
|
- | |
| 09 | 2.7261: Install timers and/or thermostats | $492 | $291 | - |
$492
-
MMBtu
|
|
| 10 | 2.6218: Turn off equipment when not in use | $6,362 | $1,090 |
$6,362
168,523
kWh
|
- | |
| TOTAL RECOMMENDED | $32,740 | $19,555 |
$21,827
397,421
kWh
|
$10,913
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $25,566 | $12,600 |
$19,187
346,131
kWh
|
$6,379
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs