ITAC Assessment: OK0143
ITAC logo
ITAC Assessment: OK0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ELECTROPLATING PARTS
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,853 1,356,975
kWh
Natural Gas $74,746 19,862
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,162

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $260 $500 - $260
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $298 $105 $298
7,913
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $604 - $771
13,482
kWh
- $(-167.0)
04 2.2511: Insulate bare equipment $3,375 $1,950 - $3,375
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $390 $550 - $390
-
MMBtu
-
06 2.3212: Optimize plant power factor $600 $1,500 $600
-
kWh
- -
TOTAL RECOMMENDED $5,527 $4,605 $1,669
21,395
kWh
$4,025
-
MMBtu
$(-167.0)
TOTAL IMPLEMENTED $1,162 $605 $1,069
21,395
kWh
$260
-
MMBtu
$(-167.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs