ITAC Assessment: OK0142
ITAC logo
ITAC Assessment: OK0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product INDUSTRIAL CONTROLS
NAICS
n/a
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 69
Plant Area
n/a
Annual Production 3,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,976 201,641
kWh
Natural Gas $2,149 460
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $877 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $777

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $164 $268 $164
2,931
kWh
-
02 2.7314: Reduce ventilation air $125 - $60
1,172
kWh
$65
-
MMBtu
03 2.7245: Use direct air supply to exhaust hoods $100 $81 $40
879
kWh
$60
-
MMBtu
04 2.2511: Insulate bare equipment $488 $58 $488
9,086
kWh
-
TOTAL RECOMMENDED $877 $407 $752
14,068
kWh
$125
-
MMBtu
TOTAL IMPLEMENTED $777 $326 $712
13,189
kWh
$65
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs