| Assessment Year | 1984 |
|---|---|
| Principal Product | ELECTRIC SUB. PUMPS |
| NAICS |
n/a
|
| SIC | 3561: Pumps and Pumping Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
n/a
|
| Annual Production | 5,000
pieces
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $117,916 | 2,468,054 |
kWh
|
$0.048 |
| Natural Gas | $27,695 | 7,591 |
MMBtu
|
$3.65 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,421 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $698 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,878 | - |
$7,878
-
kWh
|
- | |
| 02 | 2.3212: Optimize plant power factor | $1,129 | $2,590 |
$1,129
-
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,016 | - | - |
$1,016
-
MMBtu
|
|
| 04 | 2.6218: Turn off equipment when not in use | $7,700 | $2,500 | - |
$7,700
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $698 | $126 |
$698
15,533
kWh
|
- | |
| TOTAL RECOMMENDED | $18,421 | $5,216 |
$9,705
15,533
kWh
|
$8,716
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $698 | $126 |
$698
15,533
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs