ITAC Assessment: OK0140
ITAC logo
ITAC Assessment: OK0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ELECTRIC SUB. PUMPS
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 5,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,916 2,468,054
kWh
Natural Gas $27,695 7,591
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $698

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,878 - $7,878
-
kWh
-
02 2.3212: Optimize plant power factor $1,129 $2,590 $1,129
-
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,016 - - $1,016
-
MMBtu
04 2.6218: Turn off equipment when not in use $7,700 $2,500 - $7,700
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $698 $126 $698
15,533
kWh
-
TOTAL RECOMMENDED $18,421 $5,216 $9,705
15,533
kWh
$8,716
-
MMBtu
TOTAL IMPLEMENTED $698 $126 $698
15,533
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs