ITAC Assessment: KU0305
ITAC logo
ITAC Assessment: KU0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product FIBERGLASS INSULATION
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $50
M
to 100
M
# of Employees 375
Plant Area
n/a
Annual Production 98,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,479,610 80,395,077
kWh
Natural Gas $1,611,988 855,891
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,827 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,468

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $76,107 $149,700 $76,107
-
kWh
-
02 2.5194: Redesign process $27,002 $15,000 $27,002
875,440
kWh
-
03 2.2437: Recover waste heat from equipment $13,188 $20,000 - $13,188
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,169 $13,750 $7,169
232,415
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,945 - $4,945
160,317
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $416 $750 $416
13,482
kWh
-
TOTAL RECOMMENDED $128,827 $199,200 $115,639
1,281,654
kWh
$13,188
-
MMBtu
TOTAL IMPLEMENTED $81,468 $150,450 $81,468
173,799
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs