ITAC Assessment: OK0128
ITAC logo
ITAC Assessment: OK0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CUSTOM HEAT TREATING
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,800
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,630 2,399,179
kWh
Natural Gas $222,854 63,232
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,903 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,052

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $34,347 $800 - $34,347
-
MMBtu
02 2.1222: Install turbulators $10,851 $20,000 - $10,851
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $468 $972 $468
12,309
kWh
-
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,237 $650 - $1,237
-
MMBtu
TOTAL RECOMMENDED $46,903 $22,422 $468
12,309
kWh
$46,435
-
MMBtu
TOTAL IMPLEMENTED $36,052 $2,422 $468
12,309
kWh
$35,584
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs