ITAC Assessment: OK0125
ITAC logo
ITAC Assessment: OK0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ARCHITECTURAL WOODWORK
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,245 229,777
kWh
Natural Gas $7,804 1,946
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,248 $928 $1,248
35,756
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $29 - $29
879
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $42 $133 $42
1,172
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $163 $219 $163
1,172
kWh
-
05 2.7494: Install storm windows and doors $348 $712 - $348
-
MMBtu
06 2.7492: Use proper thickness of insulation on building envelope $1,022 $3,024 - $1,022
-
MMBtu
07 2.7244: Revise smoke cleanup from operations $2,562 $2,905 $1,731
49,531
kWh
$831
-
MMBtu
TOTAL RECOMMENDED $5,414 $7,921 $3,213
88,510
kWh
$2,201
-
MMBtu
TOTAL IMPLEMENTED $4,350 $4,764 $3,171
87,338
kWh
$1,179
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs