ITAC Assessment: OK0076
ITAC logo
ITAC Assessment: OK0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product CONTROL VALVES
NAICS
n/a
SIC 3594: Fluid Power Pumps and Motors
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area
n/a
Annual Production 3,000
pieces
Production Hrs. Annual 0
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,000 612,837
kWh
Natural Gas $5,970 1,760
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $818

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $173 $550 $173
-
kWh
-
02 2.4133: Use most efficient type of electric motors $40 $228 $40
879
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $433 $120 $433
8,206
kWh
-
04 2.7492: Use proper thickness of insulation on building envelope $172 $386 - $172
-
MMBtu
TOTAL RECOMMENDED $818 $1,284 $646
9,085
kWh
$172
-
MMBtu
TOTAL IMPLEMENTED $818 $1,284 $646
9,085
kWh
$172
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs