Assessment Year | 1982 |
---|---|
Principal Product | MG & AL ANODES |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 1,400,000
lb
|
Production Hrs. Annual | 8,000
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,246 | 3,700,176 |
kWh
|
$0.030 |
Natural Gas | $252,550 | 111,658 |
MMBtu
|
$2.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $114,286 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,109 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2421: Install waste heat boiler to provide direct power | $110,300 | $405,000 |
$110,300
3,199,883
kWh
|
- | |
02 | 2.7231: Use radiant heater for spot heating | $927 | $1,665 | - |
$927
-
MMBtu
|
|
03 | 2.3212: Optimize plant power factor | $1,950 | $6,385 |
$1,950
-
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,109 | $280 |
$1,109
33,705
kWh
|
- | |
TOTAL RECOMMENDED | $114,286 | $413,330 |
$113,359
3,233,588
kWh
|
$927
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,109 | $280 |
$1,109
33,705
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs