ITAC Assessment: OK0031
ITAC logo
ITAC Assessment: OK0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product MG & AL ANODES
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 1,400,000
lb
Production Hrs. Annual 8,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,246 3,700,176
kWh
Natural Gas $252,550 111,658
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,286 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,109

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2421: Install waste heat boiler to provide direct power $110,300 $405,000 $110,300
3,199,883
kWh
-
02 2.7231: Use radiant heater for spot heating $927 $1,665 - $927
-
MMBtu
03 2.3212: Optimize plant power factor $1,950 $6,385 $1,950
-
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,109 $280 $1,109
33,705
kWh
-
TOTAL RECOMMENDED $114,286 $413,330 $113,359
3,233,588
kWh
$927
-
MMBtu
TOTAL IMPLEMENTED $1,109 $280 $1,109
33,705
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs