ITAC Assessment: OD0169
ITAC logo
ITAC Assessment: OD0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 100,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,987 6,472,157
kWh
Electricity Demand $207,087 18,581
kW-mo/yr
Electricity Fees $22,586 -
Natural Gas $98,797 20,792
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,853 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,462

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $431 $258 $233
7,034
kWh
$198
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $972 $1,400 $972
16,706
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $990 $1,800 $990
16,999
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,833 $10,623 $1,690
77,081
kWh
$5,143
-
kW-mo/yr
- -
05 3.4155: Meter waste water $4,712 $1,000 - - - $4,712
06 2.8123: Pay utility bills on time $1,500 - - - - $1,500
07 4.211: Consider use / purchase of bulk materials where possible $8,415 - - - $8,415
-
MMBtu
-
TOTAL RECOMMENDED $23,853 $15,081 $3,885
117,820
kWh
$5,341
-
kW-mo/yr
$8,415
-
MMBtu
$6,212
TOTAL IMPLEMENTED $3,462 $3,200 $1,962
33,705
kWh
- - $1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs