ITAC Assessment: OD0165
ITAC logo
ITAC Assessment: OD0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Finished, Printed and Laminated Wall Panels and Cut to Size
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $100
M
to 500
M
# of Employees 170
Plant Area 4,286,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,625
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,276 7,437,866
kWh
Electricity Demand $78,661 33,600
kW-mo/yr
Electricity Fees $2,935 -
Natural Gas $197,934 13,878
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,544 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,345

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,895 $103,963 $12,750
477,726
kWh
$1,145
-
kW-mo/yr
-
02 2.7144: Install spectral reflectors / delamp $2,597 $560 $2,385
89,390
kWh
$212
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,019 $400 $3,019
112,837
kWh
- -
04 2.7135: Install occupancy sensors $1,285 $760 $1,285
48,066
kWh
- -
05 4.211: Consider use / purchase of bulk materials where possible $31,722 - - - $31,722
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,026 $2,400 - - $2,026
-
MMBtu
TOTAL RECOMMENDED $54,544 $108,083 $19,439
728,019
kWh
$1,357
-
kW-mo/yr
$33,748
-
MMBtu
TOTAL IMPLEMENTED $36,345 $2,960 $2,385
89,390
kWh
$212
-
kW-mo/yr
$33,748
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs