ITAC Assessment: OD0150
ITAC logo
ITAC Assessment: OD0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Scallops, Scallop Medallions and Fish
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 30,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,600
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,567 1,841,735
kWh
Electricity Demand $22,309 4,318
kW-mo/yr
Electricity Fees $6,832 -
Natural Gas $5,349 667
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,354 $9,564 $1,797
39,566
kWh
$557
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $370 $400 $370
8,206
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $402 $20 $402
4,103
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $611 $3,660 $573
1,465
kWh
$38
-
kW-mo/yr
-
05 3.4116: Meter recycled water (to reduce sewer charges) $779 - - - $779
-
Tgal
TOTAL RECOMMENDED $4,516 $13,644 $3,142
53,340
kWh
$595
-
kW-mo/yr
$779
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs