Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Commercial Printing
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 95,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,059 3,294,256
kWh
Electricity Demand $110,337 7,600
kW-mo/yr
Electricity Fees $1,618 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,844 $3,872 $639
43,669
kWh
$1,205
-
kW-mo/yr
-
02 2.7224: Reduce space conditioning during non-working hours $960 $450 $960
48,359
kWh
- -
03 2.7314: Reduce ventilation air $431 $126 $431
29,601
kWh
- -
04 2.2113: Repair or replace steam traps $1,854 $360 - - $1,854
-
MMBtu
TOTAL RECOMMENDED $5,089 $4,808 $2,030
121,629
kWh
$1,205
-
kW-mo/yr
$1,854
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs