ITAC Assessment: OD0145
ITAC logo
ITAC Assessment: OD0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plastic Food Containers
NAICS
n/a
SIC 3082: Unsupported Plastics Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 200,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,240 9,269,051
kWh
Electricity Demand $301,813 20,397
kW-mo/yr
Electricity Fees $2,412 -
Natural Gas $6,509 1,006
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,433 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,676

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,482 $38,557 $3,954
272,860
kWh
$5,528
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $275 $20 $275
18,757
kWh
-
03 2.6218: Turn off equipment when not in use $1,280 $495 $1,280
89,683
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $1,396 $220 $582
40,152
kWh
$814
-
kW-mo/yr
TOTAL RECOMMENDED $12,433 $39,292 $6,091
421,452
kWh
$6,342
-
kW-mo/yr
TOTAL IMPLEMENTED $2,676 $715 $1,862
129,835
kWh
$814
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs