ITAC Assessment: OD0134
ITAC logo
ITAC Assessment: OD0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Cat Litter
NAICS
n/a
SIC 3298:
Sales Range $5
M
to 10
M
# of Employees 43
Plant Area 60,043
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,594 2,082,943
kWh
Electricity Demand $44,436 5,646
kW-mo/yr
Electricity Fees $(-1,667.0) -
LPG $9,096 932
MMBtu
Wood $194,472 118,571
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $104,453 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,888 $13,066 $1,008
22,860
kWh
$880
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,153 $800 $2,153
48,945
kWh
- - -
03 2.2511: Insulate bare equipment $8,350 $30,000 - - $8,350
-
MMBtu
-
04 4.131: Modify process to reduce material use/cost $92,062 $180,000 - - - $92,062
TOTAL RECOMMENDED $104,453 $223,866 $3,161
71,805
kWh
$880
-
kW-mo/yr
$8,350
-
MMBtu
$92,062
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs