ITAC Assessment: OD0132
ITAC logo
ITAC Assessment: OD0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Mattresses, Bedspreads and Draperies
NAICS
n/a
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 67,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,666 428,781
kWh
Electricity Demand $529 1,384
kW-mo/yr
Electricity Fees $349 -
Natural Gas $8,934 1,099
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,988 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $713 $50 $696
9,965
kWh
$17
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $702 $190 $702
10,258
kWh
- - -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $7,459 - - - $7,459
-
lb
-
04 4.131: Modify process to reduce material use/cost $1,114 - - - - $1,114
TOTAL RECOMMENDED $9,988 $240 $1,398
20,223
kWh
$17
-
kW-mo/yr
$7,459
-
lb
$1,114
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs