ITAC Assessment: OD0129
ITAC logo
ITAC Assessment: OD0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Cabinets and Custom Millwork
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 37
Plant Area 14,500
ft2
Annual Production 35,000,000
units
Production Hrs. Annual 2,704
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,399 308,617
kWh
Electricity Demand $1,303 1,819
kW-mo/yr
Electricity Fees $(-2,348.0) -
Natural Gas $4,172 591
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $925 $2,165 $881
11,137
kWh
$44
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $140 $50 $128
1,758
kWh
$12
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $617 $300 $617
7,913
kWh
- -
04 2.4113: Install motor voltage controller on lightly loaded motors $891 $3,780 $855
10,844
kWh
$36
-
kW-mo/yr
-
05 2.7314: Reduce ventilation air $4,902 $10 $4,682
59,496
kWh
$220
-
kW-mo/yr
-
06 2.1116: Improve combustion control capability $109 $10 - - $109
-
MMBtu
TOTAL RECOMMENDED $7,584 $6,315 $7,163
91,148
kWh
$312
-
kW-mo/yr
$109
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings