ITAC Assessment: OD0118
ITAC logo
ITAC Assessment: OD0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Industrial Mixing Equipment
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $5
M
to 10
M
# of Employees 47
Plant Area 40,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,015
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,067 505,276
kWh
Electricity Demand $24,540 1,992
kW-mo/yr
Electricity Fees $1,426 -
Fuel Oil #2 $3,704 695
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,507

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,264 $4,586 $969
18,757
kWh
$1,295
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $45 $132 $26
586
kWh
$19
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $198 $400 $198
3,810
kWh
- -
04 2.7224: Reduce space conditioning during non-working hours $2,113 $210 - - $2,113
-
MMBtu
05 2.7224: Reduce space conditioning during non-working hours $880 $420 $880
14,654
kWh
- -
TOTAL RECOMMENDED $5,500 $5,748 $2,073
37,807
kWh
$1,314
-
kW-mo/yr
$2,113
-
MMBtu
TOTAL IMPLEMENTED $2,507 $5,118 $1,193
23,153
kWh
$1,314
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs