ITAC Assessment: OD0117
ITAC logo
ITAC Assessment: OD0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Rebuilt Machinery
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 150,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 3,640
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,378 5,509,086
kWh
Electricity Demand $27,074 18,872
kW-mo/yr
Electricity Fees $218,804 -
Natural Gas $5,581 1,398
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,497 $7,621 $3,474
173,798
kWh
$3,023
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $127 $608 $68
3,224
kWh
$59
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,198 $920 $1,198
62,720
kWh
- - -
04 2.7135: Install occupancy sensors $375 $100 $375
19,637
kWh
- - -
05 3.4155: Meter waste water $6,227 $4,595 - - $6,227
-
Tgal
-
06 4.821: Pay bills on time to avoid late fees $5,823 - - - - $5,823
TOTAL RECOMMENDED $20,247 $13,844 $5,115
259,379
kWh
$3,082
-
kW-mo/yr
$6,227
-
Tgal
$5,823
TOTAL IMPLEMENTED $13,750 $6,223 $1,641
85,581
kWh
$59
-
kW-mo/yr
$6,227
-
Tgal
$5,823
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs