ITAC Assessment: OD0110
ITAC logo
ITAC Assessment: OD0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Threaded metal rods
NAICS
n/a
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 40,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 4,862
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,612 1,005,569
kWh
Electricity Demand $18,734 2,058
kW-mo/yr
Electricity Fees $(-1,257.0) -
Natural Gas $30,663 5,237
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,976 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,976

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,812 $8,363 $4,162
65,651
kWh
$1,650
-
kW-mo/yr
02 2.4133: Use most efficient type of electric motors $6,307 $10,032 $4,537
71,805
kWh
$1,770
-
kW-mo/yr
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,397 $605 $1,266
3,810
kWh
$131
-
kW-mo/yr
04 2.7314: Reduce ventilation air $1,460 $1,100 $1,460
18,464
kWh
-
TOTAL RECOMMENDED $14,976 $20,100 $11,425
159,730
kWh
$3,551
-
kW-mo/yr
TOTAL IMPLEMENTED $14,976 $20,100 $11,425
159,730
kWh
$3,551
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs