ITAC Assessment: OD0106
ITAC logo
ITAC Assessment: OD0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Topsoil and Decorative Mulch
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 63
Plant Area 50,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 4,080
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,378 1,028,429
kWh
Electricity Demand $26,240 4,929
kW-mo/yr
Electricity Fees $12,009 -
LPG $10,155 1,139
MMBtu
Other Gas $9,068 1,608
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $153,063 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $143,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $3,634 $5,786 $2,821
54,220
kWh
$813
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,629 $1,813 $1,066
20,516
kWh
$563
-
kW-mo/yr
- -
03 4.513: Re-arrange equipment layout to reduce labor costs $7,800 $6,000 - - $7,800 -
04 4.441: Install automatic packing equipment $140,000 $20,000 - - - $140,000
TOTAL RECOMMENDED $153,063 $33,599 $3,887
74,736
kWh
$1,376
-
kW-mo/yr
$7,800 $140,000
TOTAL IMPLEMENTED $143,634 $25,786 $2,821
54,220
kWh
$813
-
kW-mo/yr
- $140,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs