ITAC Assessment: OD0101
ITAC logo
ITAC Assessment: OD0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Boat Building and Repair
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 21,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,891 798,066
kWh
Electricity Demand $19,592 3,180
kW-mo/yr
Electricity Fees $5,202 -
Fuel Oil #2 $36,630 6,491
MMBtu
Other Gas $2,278 344
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $173,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $156,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Other Gas Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Primary Raw Material Savings By-product Production Savings
01 3.6124: Burn waste oil for heat $5,664 $28,850 $2,278
-
MMBtu
$3,386
-
gal
- - - -
02 3.1175: Use a different or recycled raw material $106,000 $252,000 - - - - $106,000 -
03 3.6192: Use a less expensive method of waste removal $33,876 - - - - $33,876
-
lb
- -
04 3.6192: Use a less expensive method of waste removal $16,127 - - - $16,127
-
gal
- - -
05 4.521: Clear and rent existing space $12,000 - - - - - - $12,000
TOTAL RECOMMENDED $173,667 $280,850 $2,278
-
MMBtu
$3,386
-
gal
$16,127
-
gal
$33,876
-
lb
$106,000 $12,000
TOTAL IMPLEMENTED $156,003 $252,000 - - $16,127
-
gal
$33,876
-
lb
$106,000 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs