ITAC Assessment: OD0099
ITAC logo
ITAC Assessment: OD0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Corrugated Containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 149,200
ft2
Annual Production 720,000
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,495 4,129,836
kWh
Electricity Demand $121,798 18,266
kW-mo/yr
Electricity Fees $40,320 -
Natural Gas $28,953 19,454
MMBtu
LPG $28,953 3,322
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,349 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,502

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,007 $11,490 $3,163
158,265
kWh
$1,844
-
kW-mo/yr
- -
02 2.1212: Operate boilers on high fire setting $1,495 $1,495 - - $1,495
-
MMBtu
-
03 2.2696: Use excess cold process fluid for industrial cooling needs $19,847 $8,500 - - - $19,847
-
Tgal
TOTAL RECOMMENDED $26,349 $21,485 $3,163
158,265
kWh
$1,844
-
kW-mo/yr
$1,495
-
MMBtu
$19,847
-
Tgal
TOTAL IMPLEMENTED $6,502 $12,985 $3,163
158,265
kWh
$1,844
-
kW-mo/yr
$1,495
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs