| Assessment Year | 1997 |
|---|---|
| Principal Product | Fluid Milk |
| NAICS |
n/a
|
| SIC | 2026: Fluid Milk |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
200,000
ft2
|
| Annual Production | 44,600
Tgal
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $158,822 | 9,948,124 |
kWh
|
$0.016 |
| Electricity Demand | $251,993 | 36,660 |
kW-mo/yr
|
$6.87 |
| Electricity Fees | $62,740 | - |
|
- |
| Natural Gas | $66,213 | 14,452 |
MMBtu
|
$4.58 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $973,115 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $948,287 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $3,200 | $7,460 |
$2,015
126,026
kWh
|
$1,185
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,120 | $7,145 |
$1,848
99,062
kWh
|
$1,272
-
kW-mo/yr
|
- | - | |
| 03 | 2.3132: Recharge batteries on during off-peak demand periods | $1,350 | - | - |
$1,350
-
kW-mo/yr
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $298 | $449 |
$298
18,757
kWh
|
- | - | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,369 | $40 |
$1,369
85,580
kWh
|
- | - | - | |
| 06 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $24,828 | $34,068 | - | - |
$24,828
-
MMBtu
|
- | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,950 | $1,495 | - | - |
$2,950
-
MMBtu
|
- | |
| 08 | 4.212: Adopt in-house material generation | $936,000 | $1,000,000 | - | - | - | $936,000 | |
| TOTAL RECOMMENDED | $973,115 | $1,050,657 |
$5,530
329,425
kWh
|
$3,807
-
kW-mo/yr
|
$27,778
-
MMBtu
|
$936,000 | ||
| TOTAL IMPLEMENTED | $948,287 | $1,016,589 |
$5,530
329,425
kWh
|
$3,807
-
kW-mo/yr
|
$2,950
-
MMBtu
|
$936,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs