Assessment Year 1997
Principal Product Cigarette filters, testing media
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 245
Plant Area 129,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,394 6,232,708
kWh
Electricity Demand $209,045 29,318
kW-mo/yr
Electricity Fees $36,379 -
Natural Gas $83,869 17,923
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $327,644 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $635 $2,246 $343
20,809
kWh
$292
-
kW-mo/yr
- - - - -
02 2.7221: Lower temperature during the winter season and vice-versa $8,524 - - - $8,524
-
MMBtu
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,271 $2,578 $1,425
44,549
kWh
$1,846
-
kW-mo/yr
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,130 $1,301 $1,142
68,875
kWh
$988
-
kW-mo/yr
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,186 $600 $1,186
71,512
kWh
- - - - - -
06 2.8113: Purchase gas directly from a contract gas supplier $14,664 - - - - - - $14,664 -
07 2.1233: Analyze flue gas for proper air/fuel ratio $676 $1,495 - - $676
-
MMBtu
- - - -
08 2.2414: Use waste heat from hot flue gases to preheat $16,369 $5,800 - - $16,369
-
MMBtu
- - - -
09 3.4114: Replace city water with recycled water via cooling tower $11,623 $5,412 $(-395.0)
(-23,740)
kWh
$(-507.0)
-
kW-mo/yr
- $12,525
-
Tgal
- - -
10 3.4116: Meter recycled water (to reduce sewer charges) $367 $132 - - - $367
-
Tgal
- - -
11 3.4113: Treat and reuse rinse waters $28,199 $7,524 - - - $28,199
-
Tgal
- - -
12 4.621: Use fixtures to reduce machine changeout times $240,000 $96,000 - - - - $15,000 - $225,000
TOTAL RECOMMENDED $327,644 $123,088 $3,701
182,005
kWh
$2,619
-
kW-mo/yr
$25,569
-
MMBtu
$41,091
-
Tgal
$15,000 $14,664 $225,000
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs