ITAC Assessment: OD0070
ITAC logo
ITAC Assessment: OD0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Fabricated Structural Steel
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 387,000
ft2
Annual Production 150
pieces
Production Hrs. Annual 2,244
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,941 1,567,116
kWh
Electricity Demand $41,606 6,970
kW-mo/yr
Electricity Fees $25,099 -
Natural Gas $21,920 3,785
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 2.4314: Use synthetic lubricant $648 $312 $439
9,965
kWh
$209
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $850 $800 $850
19,050
kWh
- - -
03 2.4323: Use optimum size and capacity equipment $425 $100 $246
5,569
kWh
$179
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,667 $1,436 $960
21,395
kWh
$707
-
kW-mo/yr
- -
05 3.6124: Burn waste oil for heat $916 $2,585 - - $916
-
MMBtu
-
06 3.5248: Separate and recycle scrap metal to foundry or for sale $2,486 $800 - - - $2,486
TOTAL RECOMMENDED $6,992 $6,033 $2,495
55,979
kWh
$1,095
-
kW-mo/yr
$916
-
MMBtu
$2,486
TOTAL IMPLEMENTED $5,003 $3,036 $1,810
40,445
kWh
$707
-
kW-mo/yr
- $2,486
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs