Assessment Year | 1996 |
---|---|
Principal Product | Fabricated Structural Steel |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
387,000
ft2
|
Annual Production | 150
pieces
|
Production Hrs. Annual | 2,244
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $69,941 | 1,567,116 |
kWh
|
$0.045 |
Electricity Demand | $41,606 | 6,970 |
kW-mo/yr
|
$5.97 |
Electricity Fees | $25,099 | - |
|
- |
Natural Gas | $21,920 | 3,785 |
MMBtu
|
$5.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,992 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,003 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4314: Use synthetic lubricant | $648 | $312 |
$439
9,965
kWh
|
$209
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $850 | $800 |
$850
19,050
kWh
|
- | - | - | |
03 | 2.4323: Use optimum size and capacity equipment | $425 | $100 |
$246
5,569
kWh
|
$179
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,667 | $1,436 |
$960
21,395
kWh
|
$707
-
kW-mo/yr
|
- | - | |
05 | 3.6124: Burn waste oil for heat | $916 | $2,585 | - | - |
$916
-
MMBtu
|
- | |
06 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $2,486 | $800 | - | - | - | $2,486 | |
TOTAL RECOMMENDED | $6,992 | $6,033 |
$2,495
55,979
kWh
|
$1,095
-
kW-mo/yr
|
$916
-
MMBtu
|
$2,486 | ||
TOTAL IMPLEMENTED | $5,003 | $3,036 |
$1,810
40,445
kWh
|
$707
-
kW-mo/yr
|
- | $2,486 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs