ITAC Assessment: OD0069
ITAC logo
ITAC Assessment: OD0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Marine Air Conditioning Units
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 60,000
ft2
Annual Production 28,815
pieces
Production Hrs. Annual 4,624
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,223 741,794
kWh
Electricity Demand $19,255 3,102
kW-mo/yr
Electricity Fees $2,628 -
Fuel Oil #2 $10,354 1,737
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,569 $10,531 $4,036
45,721
kWh
$1,533
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,019 $400 $3,019
60,082
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $895 - $895
17,878
kWh
- - -
04 2.2514: Cover open tanks $1,328 $1,030 $1,328
26,377
kWh
- - -
05 2.7261: Install timers and/or thermostats $1,088 $380 $330
6,448
kWh
- $758
-
MMBtu
-
06 3.5315: Lease / purchase baler; sell cardboard to recycler $2,136 - - - - $2,136
-
lb
07 3.5248: Separate and recycle scrap metal to foundry or for sale $5,080 - - - - $5,080
-
lb
TOTAL RECOMMENDED $19,115 $12,341 $9,608
156,506
kWh
$1,533
-
kW-mo/yr
$758
-
MMBtu
$7,216
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs