ITAC Assessment: OD0068
ITAC logo
ITAC Assessment: OD0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Textile Processing
NAICS
n/a
SIC 2463:
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 102,000
ft2
Annual Production 90,000
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,871 6,091,442
kWh
Electricity Demand $162,105 13,764
kW-mo/yr
Electricity Fees $31,855 -
Natural Gas $292,146 89,580
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,141 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $6,883 $12,945 $3,403
177,315
kWh
$3,480
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,972 $6,824 $1,616
84,701
kWh
$2,356
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,832 $600 $2,832
147,421
kWh
- - -
04 2.2211: Use optimum temperature $6,054 - - - $6,054
-
MMBtu
-
05 3.5315: Lease / purchase baler; sell cardboard to recycler $2,400 - - - - $2,400
-
lb
TOTAL RECOMMENDED $22,141 $20,369 $7,851
409,437
kWh
$5,836
-
kW-mo/yr
$6,054
-
MMBtu
$2,400
-
lb
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs