ITAC Assessment: OD0055
ITAC logo
ITAC Assessment: OD0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Insulation
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 100,000
ft2
Annual Production 150
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,013 398,300
kWh
Electricity Demand $8,112 1,374
kW-mo/yr
Electricity Fees $2,644 -
Fuel Oil #2 $20,076 5,022
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,803 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $690

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $377 $947 $307
5,569
kWh
$70
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $521 $486 $380
6,741
kWh
$141
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $313 $200 $313
5,569
kWh
- - - -
04 2.5121: Redesign flow to minimize mass transfer length $957 $103 $793
14,361
kWh
$164
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,109 $1,536 $724
13,189
kWh
$385
-
kW-mo/yr
- - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $980 $500 - - $980
-
MMBtu
- -
07 3.4116: Meter recycled water (to reduce sewer charges) $388 $240 - - - $388
-
Tgal
-
08 3.5248: Separate and recycle scrap metal to foundry or for sale $158 - - - - - $158
-
lb
TOTAL RECOMMENDED $4,803 $4,012 $2,517
45,429
kWh
$760
-
kW-mo/yr
$980
-
MMBtu
$388
-
Tgal
$158
-
lb
TOTAL IMPLEMENTED $690 $1,147 $620
11,138
kWh
$70
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (non-haz) Savings