Assessment Year | 1996 |
---|---|
Principal Product | Insulation |
NAICS |
n/a
|
SIC | 3296: Mineral Wool |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
100,000
ft2
|
Annual Production | 150
thousand feet
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $22,013 | 398,300 |
kWh
|
$0.055 |
Electricity Demand | $8,112 | 1,374 |
kW-mo/yr
|
$5.90 |
Electricity Fees | $2,644 | - |
|
- |
Fuel Oil #2 | $20,076 | 5,022 |
MMBtu
|
$4.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,803 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $690 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $377 | $947 |
$307
5,569
kWh
|
$70
-
kW-mo/yr
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $521 | $486 |
$380
6,741
kWh
|
$141
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $313 | $200 |
$313
5,569
kWh
|
- | - | - | - | |
04 | 2.5121: Redesign flow to minimize mass transfer length | $957 | $103 |
$793
14,361
kWh
|
$164
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,109 | $1,536 |
$724
13,189
kWh
|
$385
-
kW-mo/yr
|
- | - | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $980 | $500 | - | - |
$980
-
MMBtu
|
- | - | |
07 | 3.4116: Meter recycled water (to reduce sewer charges) | $388 | $240 | - | - | - |
$388
-
Tgal
|
- | |
08 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $158 | - | - | - | - | - |
$158
-
lb
|
|
TOTAL RECOMMENDED | $4,803 | $4,012 |
$2,517
45,429
kWh
|
$760
-
kW-mo/yr
|
$980
-
MMBtu
|
$388
-
Tgal
|
$158
-
lb
|
||
TOTAL IMPLEMENTED | $690 | $1,147 |
$620
11,138
kWh
|
$70
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs