ITAC Assessment: OD0048
ITAC logo
ITAC Assessment: OD0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Tea products
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 364
Plant Area 250,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,978 14,953,400
kWh
Electricity Demand $355,763 29,331
kW-mo/yr
Electricity Fees $332,023 -
Natural Gas $131,183 59,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,649 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.2414: Use waste heat from hot flue gases to preheat $10,211 $13,391 - - $10,211
-
MMBtu
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,112 $1,077 $493
24,912
kWh
$619
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $4,515 $9,800 $2,914
65,944
kWh
$1,601
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,780 $3,754 $5,843
293,669
kWh
$4,937
-
kW-mo/yr
- -
05 2.4323: Use optimum size and capacity equipment $5,538 $1,332 $3,015
151,524
kWh
$2,523
-
kW-mo/yr
- -
06 3.4116: Meter recycled water (to reduce sewer charges) $7,493 $1,072 - - - $7,493
-
Tgal
TOTAL RECOMMENDED $39,649 $30,426 $12,265
536,049
kWh
$9,680
-
kW-mo/yr
$10,211
-
MMBtu
$7,493
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs