Assessment Year | 2024 |
---|---|
Principal Product | Aggregate Equipment |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $50 M to 100M |
# of Employees | 85 |
Plant Area |
55,000
ft2
|
Annual Production | 80
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $35,616 | 945,421 |
kWh
|
$0.038 | |
Electricity Demand | $29,592 | 2,919 |
kW-mo/yr
|
$10.14 | |
Electricity Fees | $1,885 | - |
|
- | |
Natural Gas | $41,193 | 6,488 |
MMBtu
|
$6.35 | |
Waste Disposal Costs | |||||
Water Usage | $3,277 | 170 |
Tgal
|
$19.28 | |
TOTAL YEARLY COSTS | $111,563 | ||||
RECOMMENDED SAVINGS* | $81,101 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $24,209 | $186,605 |
$9,480
249,478
kWh
|
$14,728
-
kW-mo/yr
|
- | - | |
02 | 3.5316: Contract a wood pallet recycling company | $26,388 | $3,600 | - | - | - | $26,388 | |
03 | 2.4239: Eliminate or reduce compressed air usage | $2,886 | $205 |
$80
2,096
kWh
|
$2,806
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,652 | - |
$2,697
70,984
kWh
|
$1,954
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,042 | $205 |
$91
2,406
kWh
|
$1,950
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,487 | - |
$2,602
68,466
kWh
|
$1,885
-
kW-mo/yr
|
- | - | |
07 | 2.5113: Use direct flame impingement or infrared processing for chamber type heating | $13,766 | $3,820 |
$(-185.0)
(-4,875)
kWh
|
$(-912.0)
-
kW-mo/yr
|
$14,863
-
MMBtu
|
- | |
08 | 2.1115: Eliminate combustible gas in flue gas | $2,673 | $890 | - | - |
$2,673
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $81,101 | $195,324 |
$14,765
388,555
kWh
|
$22,412
-
kW-mo/yr
|
$17,536
-
MMBtu
|
$26,388 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs