ITAC Assessment: OD0046
ITAC logo
ITAC Assessment: OD0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Luncheon Meats
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 43,000
ft2
Annual Production 9,400,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,046 3,537,222
kWh
Electricity Demand $99,577 9,189
kW-mo/yr
Electricity Fees $7,023 -
Fuel Oil #2 $79,751 18,399
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,198 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,666

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $578 $1,512 $220
7,034
kWh
$358
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,356 $1,603 $532
16,999
kWh
$824
-
kW-mo/yr
- - -
03 2.2136: Install / repair insulation on steam lines $6,166 $3,150 - - $6,166
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,088 $240 $492
15,533
kWh
$596
-
kW-mo/yr
- - -
05 2.4314: Use synthetic lubricant $757 $312 $472
14,947
kWh
$285
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $181 $354 $181
5,862
kWh
- - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $39,000 - - - - - $39,000
-
lb
08 3.4115: Recover and reuse cooling water $3,072 $8,100 - - - $3,072
-
Tgal
-
TOTAL RECOMMENDED $52,198 $15,271 $1,897
60,375
kWh
$2,063
-
kW-mo/yr
$6,166
-
MMBtu
$3,072
-
Tgal
$39,000
-
lb
TOTAL IMPLEMENTED $40,666 $1,752 $712
22,567
kWh
$954
-
kW-mo/yr
- - $39,000
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs