ITAC Assessment: OD0036
ITAC logo
ITAC Assessment: OD0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Asphalt
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 100,000
ft2
Annual Production 321,249
ton
Production Hrs. Annual 3,368
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,330 1,826,202
kWh
Natural Gas $222,120 55,696
MMBtu
Fuel Oil #2 $9,807 1,806
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4131: Size electric motors for peak operating efficiency $12,439 $45,026 $12,439
116,940
kWh
-
02 2.2511: Insulate bare equipment $7,287 $5,655 - $7,287
-
MMBtu
03 2.7491: Insulate glazing, walls, ceilings, and roofs $6,704 $20,250 - $6,704
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,181 $800 $1,181
11,137
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,206 $2,885 $4,206
39,566
kWh
-
06 2.7135: Install occupancy sensors $1,256 $960 $1,256
11,723
kWh
-
TOTAL RECOMMENDED $33,073 $75,576 $19,082
179,366
kWh
$13,991
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs