ITAC Assessment: OD0035
ITAC logo
ITAC Assessment: OD0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Steel, iron and bronze castings
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 105
Plant Area 120,000
ft2
Annual Production 2,240,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,119 1,911,196
kWh
Natural Gas $56,026 9,001
MMBtu
Fuel Oil #2 $24,374 3,648
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,655 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,188 $9,793 $12,188
116,061
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,524 $9,150 $5,524
52,462
kWh
03 2.7135: Install occupancy sensors $461 $265 $461
4,396
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $482 $1,389 $482
4,689
kWh
TOTAL RECOMMENDED $18,655 $20,597 $18,655
177,608
kWh
TOTAL IMPLEMENTED $17,712 $18,943 $17,712
168,523
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs