ITAC Assessment: OD0026
ITAC logo
ITAC Assessment: OD0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Doughnuts
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 4,800
ft2
Annual Production 520,000
lb
Production Hrs. Annual 7,280
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,350 365,768
kWh
Natural Gas $11,023 1,808
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,983 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,759

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,710 $3,687 $2,710
42,497
kWh
-
02 2.2511: Insulate bare equipment $1,012 $400 $1,012
17,878
kWh
-
03 2.2511: Insulate bare equipment $224 $94 - $224
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $37 $54 $37
586
kWh
-
TOTAL RECOMMENDED $3,983 $4,235 $3,759
60,961
kWh
$224
-
MMBtu
TOTAL IMPLEMENTED $3,759 $4,141 $3,759
60,961
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs