ITAC Assessment: OD0017
ITAC logo
ITAC Assessment: OD0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Ammoniated fertilizers, pelleted lime & gypsum
NAICS
n/a
SIC 2875: Fertilizers, Mixing Only
Sales Range $5
M
to 10
M
# of Employees 32
Plant Area 100,000
ft2
Annual Production 95,000
pieces
Production Hrs. Annual 2,944
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,847 1,293,963
kWh
Natural Gas $50,658 23,378
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,006 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,623

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,980 $200 - $1,980
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $242 $200 - $242
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $980 $800 $980
11,137
kWh
- -
04 2.8112: Combine utility meters $4,530 $7,960 - - $4,530
05 2.2136: Install / repair insulation on steam lines $209 $102 - $209
-
MMBtu
-
06 2.4133: Use most efficient type of electric motors $3,264 $8,257 $3,264
36,928
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,157 $2,182 $2,157
24,619
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $9,644 $17,182 $9,644
109,613
kWh
- -
TOTAL RECOMMENDED $23,006 $36,883 $16,045
182,297
kWh
$2,431
-
MMBtu
$4,530
TOTAL IMPLEMENTED $8,623 $11,639 $6,401
72,684
kWh
$2,222
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs