| Assessment Year | 1995 |
|---|---|
| Principal Product | Ammoniated fertilizers, pelleted lime & gypsum |
| NAICS |
n/a
|
| SIC | 2875: Fertilizers, Mixing Only |
| Sales Range | $5 M to 10M |
| # of Employees | 32 |
| Plant Area |
100,000
ft2
|
| Annual Production | 95,000
pieces
|
| Production Hrs. Annual | 2,944
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $113,847 | 1,293,963 |
kWh
|
$0.088 |
| Natural Gas | $50,658 | 23,378 |
MMBtu
|
$2.17 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,006 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,623 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,980 | $200 | - |
$1,980
-
MMBtu
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $242 | $200 | - |
$242
-
MMBtu
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $980 | $800 |
$980
11,137
kWh
|
- | - | |
| 04 | 2.8112: Combine utility meters | $4,530 | $7,960 | - | - | $4,530 | |
| 05 | 2.2136: Install / repair insulation on steam lines | $209 | $102 | - |
$209
-
MMBtu
|
- | |
| 06 | 2.4133: Use most efficient type of electric motors | $3,264 | $8,257 |
$3,264
36,928
kWh
|
- | - | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,157 | $2,182 |
$2,157
24,619
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,644 | $17,182 |
$9,644
109,613
kWh
|
- | - | |
| TOTAL RECOMMENDED | $23,006 | $36,883 |
$16,045
182,297
kWh
|
$2,431
-
MMBtu
|
$4,530 | ||
| TOTAL IMPLEMENTED | $8,623 | $11,639 |
$6,401
72,684
kWh
|
$2,222
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs