Assessment Year | 2024 |
---|---|
Principal Product | Dock Levelers and Trailer Restraints |
NAICS | 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
Sales Range | $100 M to 500M |
# of Employees | 339 |
Plant Area |
425,000
ft2
|
Annual Production | 43,000
units
|
Production Hrs. Annual | 6,100
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $255,927 | 4,450,200 |
kWh
|
$0.058 |
Electricity Demand | $45,497 | 10,404 |
kW-mo/yr
|
$4.37 |
Electricity Fees | $198,059 | - |
|
- |
Natural Gas | $61,742 | 10,803 |
MMBtu
|
$5.72 |
LPG | $7,986 | 279 |
MMBtu
|
$28.62 |
TOTAL YEARLY COSTS | $569,212 | |||
RECOMMENDED SAVINGS* | $100,915 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $6,979 | $25,000 |
$(-1,007.4)
(-17,520)
kWh
|
- |
$7,986
-
MMBtu
|
|
02 | 2.4239: Eliminate or reduce compressed air usage | $20,601 | $8,975 |
$20,601
358,276
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,008 | $1,523 |
$4,008
70,136
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,356 | - |
$3,356
57,867
kWh
|
- | - | |
05 | 2.7132: Install timers on light switches in little used areas | $1,396 | $255 |
$1,396
24,506
kWh
|
- | - | |
06 | 2.9114: Use solar heat to make electricty | $64,575 | $710,500 |
$57,284
996,079
kWh
|
$7,291
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $100,915 | $746,252 |
$85,637
1,489,344
kWh
|
$7,291
-
kW-mo/yr
|
$7,986
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||