ITAC Assessment: OD0014
ITAC logo
ITAC Assessment: OD0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Corrugated boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 130,000
ft2
Annual Production 30,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,950 2,163,540
kWh
Natural Gas $24,157 4,390
MMBtu
Fuel Oil #4 $118,279 23,240
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,115

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Water Consumption Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $760 $1,242 $760
11,430
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,974 $4,176 $1,974
30,481
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,646 $800 $2,646
44,256
kWh
- - -
04 2.1333: Convert combustion equipment to burn oil $28,185 $14,000 - $(-75,952.0)
-
MMBtu
$104,137
-
MMBtu
-
05 2.2511: Insulate bare equipment $3,144 $3,183 - $3,144
-
MMBtu
- -
06 2.2223: Enhance sensitivity of temperature control and cutoff $5,709 $975 - $5,709
-
MMBtu
- -
07 3.4155: Meter waste water $1,403 $200 - - - $1,403
-
Tgal
TOTAL RECOMMENDED $43,821 $24,576 $5,380
86,167
kWh
$(-67,099.0)
-
MMBtu
$104,137
-
MMBtu
$1,403
-
Tgal
TOTAL IMPLEMENTED $9,115 $3,017 $3,406
55,686
kWh
$5,709
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs