ITAC Assessment: OD0010
ITAC logo
ITAC Assessment: OD0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Coated Abrasives
NAICS
n/a
SIC 3291: Abrasive Products
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 140,000
ft2
Annual Production 36,597
thousand feet
Production Hrs. Annual 4,200
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,763 4,880,715
kWh
Natural Gas $139,609 39,172
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,187 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,348 $3,873 $2,348
39,273
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $965 $800 $965
16,120
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,624 $25 $1,624
24,326
kWh
04 2.4133: Use most efficient type of electric motors $927 $7,684 $927
10,258
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $323 $187 $323
5,275
kWh
TOTAL RECOMMENDED $6,187 $12,569 $6,187
95,252
kWh
TOTAL IMPLEMENTED $6,187 $12,569 $6,187
95,252
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs