ITAC Assessment: NV0169
ITAC logo
ITAC Assessment: NV0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product prepared feeds
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $100
M
to 500
M
# of Employees 120
Plant Area 80,000
ft2
Annual Production 205,030
ton
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $619,452 15,249,000
kWh
Electricity Demand $264,738 27,411
kW-mo/yr
Electricity Fees $16,038 -
Natural Gas $627,522 146,616
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $208,044 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $308

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $16,388 $5,060 $12,361
301,290
kWh
$4,027
-
kW-mo/yr
- - - -
02 2.7145: Install skylights $13,086 $25,700 $12,956
318,875
kWh
- $130 - - -
03 2.2136: Install / repair insulation on steam lines $865 $620 - - - $865
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $308 $661 $230
5,569
kWh
$75
-
kW-mo/yr
$3 - - -
05 4.631: Install an uninteruptable power supply $164,384 $1,250 - - - - - $164,384
06 4.425: Eliminate/reduce redundant inspections $13,013 $1,000 - - - - $13,013 -
TOTAL RECOMMENDED $208,044 $34,291 $25,547
625,734
kWh
$4,102
-
kW-mo/yr
$133 $865
-
MMBtu
$13,013 $164,384
TOTAL IMPLEMENTED $308 $661 $230
5,569
kWh
$75
-
kW-mo/yr
$3 - - -