ITAC Assessment: NV0159
ITAC logo
ITAC Assessment: NV0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Measuring&Controlling Devices
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 12,000
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 4,900
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,715 788,687
kWh
Electricity Demand $36,613 2,844
kW-mo/yr
Electricity Fees $301 -
Natural Gas $16,148 2,419
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,969 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,038 $120 n/a $7,418
113,130
kWh
$3,620
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $3,714 $2,756 n/a $2,730
26,671
kWh
$984
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $4,203 $688 n/a $4,190
63,599
kWh
- $13 -
04 3.6194: Ship hydraulic oil to secondary fuel program $3,014 $9,025 n/a - - - $3,014
TOTAL RECOMMENDED $21,969 $12,589 $14,338
203,400
kWh
$4,604
-
kW-mo/yr
$13 $3,014
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs