ITAC Assessment: NV0155
ITAC logo
ITAC Assessment: NV0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Woodworking Machinery
NAICS
n/a
SIC 3553: Woodworking Machinery
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 7,000,000
pieces
Production Hrs. Annual 3,952
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,065 447,831
kWh
Electricity Demand $14,774 1,246
kW-mo/yr
Electricity Fees $3,516 -
Natural Gas $3,746 469
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,977 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,525

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $836 $462 $782
10,551
kWh
$32
-
kW-mo/yr
$22 - - -
02 2.7145: Install skylights $4,525 $8,000 $4,407
59,789
kWh
- $118 - - -
03 2.6218: Turn off equipment when not in use $782 $300 $782
10,551
kWh
- - - - -
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,780 $1,992 - - - $3,780
-
gal
- -
05 3.7198: Reduce / eliminate use of disposable product $950 $1,524 - - - - $950
-
lb
-
06 4.513: Re-arrange equipment layout to reduce labor costs $13,104 $7,980 - - - - - $13,104
TOTAL RECOMMENDED $23,977 $20,258 $5,971
80,891
kWh
$32
-
kW-mo/yr
$140 $3,780
-
gal
$950
-
lb
$13,104
TOTAL IMPLEMENTED $4,525 $8,000 $4,407
59,789
kWh
- $118 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs