Assessment Year | 2000 |
---|---|
Principal Product | Woodworking Machinery |
NAICS |
n/a
|
SIC | 3553: Woodworking Machinery |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 7,000,000
pieces
|
Production Hrs. Annual | 3,952
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $33,065 | 447,831 |
kWh
|
$0.074 |
Electricity Demand | $14,774 | 1,246 |
kW-mo/yr
|
$11.86 |
Electricity Fees | $3,516 | - |
|
- |
Natural Gas | $3,746 | 469 |
MMBtu
|
$7.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,977 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,525 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $836 | $462 |
$782
10,551
kWh
|
$32
-
kW-mo/yr
|
$22 | - | - | - | |
02 | 2.7145: Install skylights | $4,525 | $8,000 |
$4,407
59,789
kWh
|
- | $118 | - | - | - | |
03 | 2.6218: Turn off equipment when not in use | $782 | $300 |
$782
10,551
kWh
|
- | - | - | - | - | |
04 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $3,780 | $1,992 | - | - | - |
$3,780
-
gal
|
- | - | |
05 | 3.7198: Reduce / eliminate use of disposable product | $950 | $1,524 | - | - | - | - |
$950
-
lb
|
- | |
06 | 4.513: Re-arrange equipment layout to reduce labor costs | $13,104 | $7,980 | - | - | - | - | - | $13,104 | |
TOTAL RECOMMENDED | $23,977 | $20,258 |
$5,971
80,891
kWh
|
$32
-
kW-mo/yr
|
$140 |
$3,780
-
gal
|
$950
-
lb
|
$13,104 | ||
TOTAL IMPLEMENTED | $4,525 | $8,000 |
$4,407
59,789
kWh
|
- | $118 | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs