Assessment Year | 2000 |
---|---|
Principal Product | Structural Wood I-Joists |
NAICS |
n/a
|
SIC | 2439: Structural Wood Members, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 0 |
Plant Area |
57,000
ft2
|
Annual Production | 40,000
thousand feet
|
Production Hrs. Annual | 4,860
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $250,707 | 5,150,059 |
kWh
|
$0.049 |
Electricity Demand | $59,679 | 12,523 |
kW-mo/yr
|
$4.77 |
Electricity Fees | $(-8,861.0) | - |
|
- |
Natural Gas | $23,978 | 3,864 |
MMBtu
|
$6.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,737 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,320 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $6,243 | $5,535 |
$4,394
60,375
kWh
|
- | $1,849 | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $642 | $450 |
$507
10,551
kWh
|
$179
-
kW-mo/yr
|
$(-44.0) | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $532 | $500 |
$378
7,913
kWh
|
$185
-
kW-mo/yr
|
$(-31.0) | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $898 | $303 |
$812
16,999
kWh
|
$156
-
kW-mo/yr
|
$(-70.0) | - | |
05 | 3.5313: Increase amount of waste recovered for resale | $1,244 | - | - | - | - |
$1,244
-
lb
|
|
06 | 3.5313: Increase amount of waste recovered for resale | $1,178 | $3,500 | - | - | - |
$1,178
-
lb
|
|
TOTAL RECOMMENDED | $10,737 | $10,288 |
$6,091
95,838
kWh
|
$520
-
kW-mo/yr
|
$1,704 |
$2,422
-
lb
|
||
TOTAL IMPLEMENTED | $3,320 | $3,803 |
$812
16,999
kWh
|
$156
-
kW-mo/yr
|
$(-70.0) |
$2,422
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs