ITAC Assessment: NV0152
ITAC logo
ITAC Assessment: NV0152
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Structural Wood I-Joists
NAICS
n/a
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 0
Plant Area 57,000
ft2
Annual Production 40,000
thousand feet
Production Hrs. Annual 4,860
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,707 5,150,059
kWh
Electricity Demand $59,679 12,523
kW-mo/yr
Electricity Fees $(-8,861.0) -
Natural Gas $23,978 3,864
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,737 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.3212: Optimize plant power factor $6,243 $5,535 $4,394
60,375
kWh
- $1,849 -
02 2.4221: Install compressor air intakes in coolest locations $642 $450 $507
10,551
kWh
$179
-
kW-mo/yr
$(-44.0) -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $532 $500 $378
7,913
kWh
$185
-
kW-mo/yr
$(-31.0) -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $898 $303 $812
16,999
kWh
$156
-
kW-mo/yr
$(-70.0) -
05 3.5313: Increase amount of waste recovered for resale $1,244 - - - - $1,244
-
lb
06 3.5313: Increase amount of waste recovered for resale $1,178 $3,500 - - - $1,178
-
lb
TOTAL RECOMMENDED $10,737 $10,288 $6,091
95,838
kWh
$520
-
kW-mo/yr
$1,704 $2,422
-
lb
TOTAL IMPLEMENTED $3,320 $3,803 $812
16,999
kWh
$156
-
kW-mo/yr
$(-70.0) $2,422
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs