ITAC Assessment: NV0144
ITAC logo
ITAC Assessment: NV0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Moulded Wood Products
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 339
Plant Area 194,000
ft2
Annual Production 10,946,132
units
Production Hrs. Annual 4,394
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,585 4,238,277
kWh
Electricity Demand $146,289 12,849
kW-mo/yr
Electricity Fees $(-11,187.0) -
Natural Gas $11,391 4,168
MMBtu
LPG $3,437 485
MMBtu
Fuel Oil #4 $7,617 1,261
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,668

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2515: Use optimum thickness insulation $418 $788 - - - $418
-
MMBtu
02 2.3212: Optimize plant power factor $6,393 $5,533 $6,393
55,100
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,668 $800 $3,990
73,857
kWh
$2,549
-
kW-mo/yr
$129 -
TOTAL RECOMMENDED $13,479 $7,121 $10,383
128,957
kWh
$2,549
-
kW-mo/yr
$129 $418
-
MMBtu
TOTAL IMPLEMENTED $6,668 $800 $3,990
73,857
kWh
$2,549
-
kW-mo/yr
$129 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs