ITAC Assessment: NV0139
ITAC logo
ITAC Assessment: NV0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Commerical Printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area 40,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,970 1,291,618
kWh
Electricity Demand $23,830 3,847
kW-mo/yr
Electricity Fees $8,706 -
Natural Gas $3,097 443
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,567

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,567 $600 $2,617
43,376
kWh
$652
-
kW-mo/yr
$298
02 2.6218: Turn off equipment when not in use $5,129 - $4,052
67,116
kWh
$707
-
kW-mo/yr
$370
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,871 $4,148 $1,479
24,619
kWh
$257
-
kW-mo/yr
$135
04 2.7241: Install outside air damper / economizer on hvac unit $2,592 $2,832 $1,997
42,790
kWh
$408
-
kW-mo/yr
$187
TOTAL RECOMMENDED $13,159 $7,580 $10,145
177,901
kWh
$2,024
-
kW-mo/yr
$990
TOTAL IMPLEMENTED $10,567 $4,748 $8,148
135,111
kWh
$1,616
-
kW-mo/yr
$803
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs