ITAC Assessment: NV0137
ITAC logo
ITAC Assessment: NV0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Machine Parts
NAICS
n/a
SIC 3451: Screw Machine Products
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 27,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,885 668,230
kWh
Electricity Demand $15,423 1,662
kW-mo/yr
Electricity Fees $1,988 -
Natural Gas $7,656 1,420
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,257 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,960

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $1,544 $1,000 - - - $1,544
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $372 $300 $202
4,689
kWh
$163
-
kW-mo/yr
$7 - - -
03 2.7144: Install spectral reflectors / delamp $198 $25 $143
3,517
kWh
$51
-
kW-mo/yr
$4 - - -
04 2.7231: Use radiant heater for spot heating $2,377 $4,576 - - - $2,377
-
MMBtu
- -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $376 - - - - - $376
-
lb
-
06 4.111: Add equipment/ operators to reduce production bottleneck $26,390 $7,970 - - - - - $26,390
TOTAL RECOMMENDED $31,257 $13,871 $345
8,206
kWh
$214
-
kW-mo/yr
$11 $3,921
-
MMBtu
$376
-
lb
$26,390
TOTAL IMPLEMENTED $26,960 $8,295 $345
8,206
kWh
$214
-
kW-mo/yr
$11 - - $26,390
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs