ITAC Assessment: NC0116
ITAC logo
ITAC Assessment: NC0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Textile machinery parts, automotive parts, gas grills
NAICS
n/a
SIC 3490:
Sales Range $10
M
to 50
M
# of Employees 153
Plant Area 116,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,367 3,686,401
kWh
Electricity Demand $103,837 12,279
kW-mo/yr
Natural Gas $48,047 7,981
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,487 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,096

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,301 $690 $654
19,343
kWh
$647
-
kW-mo/yr
- - - -
02 2.2511: Insulate bare equipment $2,743 $188 $1,784
60,668
kWh
$959
-
kW-mo/yr
- - - -
03 2.2515: Use optimum thickness insulation $6,052 $447 $2,296
77,960
kWh
$3,756
-
kW-mo/yr
- - - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $3,450 $480 - - $450
-
lb
- $3,000 -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $13,840 $1,350 - - - - - $13,840
06 4.423: Move product using mechanical means $101 $250 - - - $101 - -
TOTAL RECOMMENDED $27,487 $3,405 $4,734
157,971
kWh
$5,362
-
kW-mo/yr
$450
-
lb
$101 $3,000 $13,840
TOTAL IMPLEMENTED $10,096 $1,325 $4,734
157,971
kWh
$5,362
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs