ITAC Assessment: NV0133
ITAC logo
ITAC Assessment: NV0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Packaging Paper & Plastic
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area 25,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,109 1,728,019
kWh
Electricity Demand $38,057 4,101
kW-mo/yr
Electricity Fees $5,999 -
Natural Gas $68,106 13,178
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,758

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.1224: Replace boiler $20,745 $14,694 - - - $2,189
-
MMBtu
- $18,556
02 2.3212: Optimize plant power factor $3,872 $5,370 $2,370
35,756
kWh
- $1,502 - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $38,194 $38,194 $26,228
628,664
kWh
$11,217
-
kW-mo/yr
$749 - - -
04 2.7231: Use radiant heater for spot heating $6,458 $7,275 - - - $6,458
-
MMBtu
- -
05 2.7243: Improve air circulation with destratification fans / other methods $4,917 $9,200 $(-224.0)
(-5,275)
kWh
$(-69.0)
-
kW-mo/yr
$(-6.0) $5,216
-
MMBtu
- -
06 2.8123: Pay utility bills on time $1,013 - - - - - $1,013 -
TOTAL RECOMMENDED $75,199 $74,733 $28,374
659,145
kWh
$11,148
-
kW-mo/yr
$2,245 $13,863
-
MMBtu
$1,013 $18,556
TOTAL IMPLEMENTED $21,758 $14,694 - - - $2,189
-
MMBtu
$1,013 $18,556
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs